Thursday June 1st beginning at 6:00am OIS and ITS will be upgrading the core network switch that serves the Glaxo Building. The upgrade will require a total outage of network access in Glaxo for up to 20 minutes.

When Jun 01, 2012
from 06:00 AM to 06:30 AM
Where Glaxo Building
Contact Name OIS Networking
Add event to calendar vCal
iCal

The central network switch (Building Entry Switch) for Glaxo Building will be replaced on Thursday June 1 beginning 6:00am.  A new switch will be installed, all of the uplink connections established, and internal network connections migrated to the new switch.  OIS expects it will take 10 minutes to install and uplink the new chassis and 10 minutes to migrate the existing internal connections.